Характеристики изображения:

  • Разрешение: 3862×3679
  • Размер: 1.23 MB
  • Добавил: Wheels&Tracks , 6 месяцев назад
  • Дата снимка: 25.08.2014
  • Статус изображения: Принято

Все изображения являются чьей-либо собственностью.

Если вы считаете, что пользователи сайта ошиблись, разместив данную картинку в этом разделе, то было бы здорово, если бы вы написали об этом в комментариях и указали на ошибку.

Поделиться своей радостью, обсудить наболевшее и просто поболтать об автомобилях и не только вы можете на нашем форуме.

Комментарии

6 месяцев назад
Wheels&Tracks

17/10/2014

Liebherr has developed an innovative concept for erecting LR 1600/2 crawler cranes with long wind power boom systems efficiently and safely. Using the mass of an LTR 1220 telescopic crawler crane as the counterweight significantly reduces the amount of ballast that has to be transported and eliminates ballast handling on site.

The new concept was unveiled in August by Liebherr-Werk Ehingen GmbH. More than 60 customers who have an LR 1600/2 in their fleet or work in the wind power industry were guests in Ehingen for this purpose. An SL10DFB main boom system with a main boom measuring 153 metres in length and a 12 metre fixed jib was used as a standard, practical example. With the conventional procedure full ballast with 350 tonnes of derrick ballast would be required to erect this system. This is then reduced to 70 tonnes of ballast for hoisting the standard wind turbine components. The ballast plates must then be re-attached for the full ballast of 350 tonnes so that the boom can be lowered again.

Using the new method the time-consuming ballast handling and transport of 280 tonnes of ballast is no longer required since overall only 70 tonnes of ballast plates are required for use as suspended ballast. During the erection and lowering of the boom system, an additionally LTR 1220 telescopic crawler crane was used as a counterweight, attached to the telescopic boom using an adapter. The crane and ballast plate are attached to the derrick jib using a cross beam with strap loops. After the erection process the telescopic crawler crane is detached again. The remaining 70 tonnes of derrick ballast can now be used to hoist the load, for example a machine housing.

The hook block on the LTR 1220 remains reeved during the erection process. This means that the telescopic crawler crane can quickly be used again afterwards for handling components of the wind turbines or other work.

To highlight the practicality of the new concept, a hoist was made at the production plant in Ehingen with a load of 71 tonnes with a radius of 24 metres. The assembly of a wind turbine with a 150 metre tower was simulated using these main data. The new concept was greeted with a great deal of interest on the part of the invited customers.

https://www.liebherr.com

Чтобы иметь возможность оставлять комментарии, необходимо зарегистрироваться или войти на сайт с помощью учётной записи в одной из социальных сетей

AutoWP.ru '2005–н.в.